Our 7822 rubber tracked rig finished continuous sampling and auger drilled a 6.5" diameter hole so that sacrificial anode cathodic protection could be inserted down the hole to protect the UST system from corrosion. It installs monitoring, recovery, and air sparge and pre-packed wells just as easily.